Eurosai   

                                                          Para acceder directamente al contenido wichtigsten pulsa geben
  1. Databases
  2. Audits
  3. Planning of waste incinerator with energy recovery in Fier Municipality

Planning of waste incinerator with energy recovery in Fier Municipality

Audit Id 1593523390088
Title Planning of waste incinerator with energy recovery in Fier Municipality
Titel in der Originalsprache

Planifikimi i impiantit të përpunimit dhe djegies së mbetjeve për prodhim energjie në Bashkinë Fier

Albanian

Jahr 2018
Betreff

Environment and Natural Resources

Typ

Performance

Art der Leistung

Performed by single SAI

Beschreibung In response to the main audit question: "Has the planning of the project on management and processing of urban waste at Fier Municipality in the construction of a waste incinerator for energy recovery been carried out properly?" concluded in the message: In developing the project for the incineration of urban waste for energy recovery, stakeholders have been only formally consulted, such as the public, which has been consistently opposed, and official local institutions which have not given their professional opinion and have not represented their public, but the project has been decided to be developed despite this situation. The project has been set up and is moving forward comparing only 2 alternatives, the existing one without a project and the one that can be according to this project. In selecting this alternative, other possible alternatives have not been considered, bypassing the processes of waste reuse and recycling, and thus not implementing the National Waste Strategy.
Autor

Albania

Materialien

Summary

Albanian

See summary
Kontakt
Performance Audit Department
kmuca@klsh.org.al
http://www.klsh.org.al/
  • <fmt:message key='org.eurosai.action.EmailPage' />
  • <fmt:message key='org.eurosai.action.PdfPage' />
  • <fmt:message key='org.eurosai.action.PrintPage' />

Diese Website wird von EUROSAI verwaltet - Legal disclaimer