Eurosai   

                                                          Para Acceder directamente al contenido principal pulse enter
  1. Bases de Datos
  2. Auditorías
  3. Planning of waste incinerator with energy recovery in Fier Municipality

Planning of waste incinerator with energy recovery in Fier Municipality

Audit Id 1593523390088
Título Planning of waste incinerator with energy recovery in Fier Municipality
Tí tulo en el idioma original

Planifikimi i impiantit të përpunimit dhe djegies së mbetjeve për prodhim energjie në Bashkinë Fier

Albanian

Año 2018
Asunto

Environment and Natural Resources

Tipo

Performance

Tipo de acción

Performed by single SAI

Descripción In response to the main audit question: "Has the planning of the project on management and processing of urban waste at Fier Municipality in the construction of a waste incinerator for energy recovery been carried out properly?" concluded in the message: In developing the project for the incineration of urban waste for energy recovery, stakeholders have been only formally consulted, such as the public, which has been consistently opposed, and official local institutions which have not given their professional opinion and have not represented their public, but the project has been decided to be developed despite this situation. The project has been set up and is moving forward comparing only 2 alternatives, the existing one without a project and the one that can be according to this project. In selecting this alternative, other possible alternatives have not been considered, bypassing the processes of waste reuse and recycling, and thus not implementing the National Waste Strategy.
Autor

Albania

Materiales

Summary

Albanian

See summary
Contacto
Performance Audit Department
kmuca@klsh.org.al
http://www.klsh.org.al/
  • <fmt:message key='org.eurosai.action.EmailPage' />
  • <fmt:message key='org.eurosai.action.PdfPage' />
  • <fmt:message key='org.eurosai.action.PrintPage' />

Este sitio está gestionado por EUROSAI - Legal disclaimer