Eurosai   

                                                          Для Перехода к основному содержанию нажмите на ввод
  1. Базы данных
  2. Аудит
  3. Planning of waste incinerator with energy recovery in Fier Municipality

Planning of waste incinerator with energy recovery in Fier Municipality

Audit Id 1593523390088
Title Planning of waste incinerator with energy recovery in Fier Municipality
Название на языке оригинала

Planifikimi i impiantit të përpunimit dhe djegies së mbetjeve për prodhim energjie në Bashkinë Fier

Albanian

Год 2018
Предмет

Environment and Natural Resources

ТиП

Performance

Действие

Performed by single SAI

оПисания In response to the main audit question: "Has the planning of the project on management and processing of urban waste at Fier Municipality in the construction of a waste incinerator for energy recovery been carried out properly?" concluded in the message: In developing the project for the incineration of urban waste for energy recovery, stakeholders have been only formally consulted, such as the public, which has been consistently opposed, and official local institutions which have not given their professional opinion and have not represented their public, but the project has been decided to be developed despite this situation. The project has been set up and is moving forward comparing only 2 alternatives, the existing one without a project and the one that can be according to this project. In selecting this alternative, other possible alternatives have not been considered, bypassing the processes of waste reuse and recycling, and thus not implementing the National Waste Strategy.
Author

Albania

Материалы

Summary

Albanian

See summary
Контакт
Performance Audit Department
kmuca@klsh.org.al
http://www.klsh.org.al/
  • <fmt:message key='org.eurosai.action.EmailPage' />
  • <fmt:message key='org.eurosai.action.PdfPage' />
  • <fmt:message key='org.eurosai.action.PrintPage' />

Управление сайтом осуществляет EUROSAI - Legal disclaimer